Project overview:
Total construction area: about 1,430,000㎡
Geographical position:Nange Zhuang, Daxing District, north shore of Yongding River,south direction of Beijing City
This session the passenger handling capacity of North Terminal of Beijing new airport is 72,000,000people annually,the construconof the terminal is to meet 45,000,000 people at the first stage and can lead to the subsequent construction of the Satellite Terminal, thus it can reach the handling capacity aim of 72,000,000 people this session.
The terminal covers an area equivalent to a 1200 meter diameter circle. The total length between north and south is 940 meter, the width between west and east is 1080 meter.
Beijing new airport , the main body is mainly terminal, the architectural area is about 1,400,000square meter. It will be the largest monomer airport bulidng, which can fully cover 180 standard football field. The comprison between Bejing new airport and T3C terminal of Beijing Capital airport at the same propotion.
The supporing spacing at the center of Beijing new airport is up to 200 meter, the non-column space can completely contain a Water Cube.
In oreder to grantee the integration of supproting structure, the roof surface at the center area and the funcation area, we make the concrete slabs at terminal center area 513 meter*411 meter and seamless, which is the largest single piece concrete slabs in China. This complete concrete slab can hold National Sports Center( Bird’s Nest) over it.